Gravel driveway calculator

A driveway is usually built in layers of different stone. Set the plan once, then the base and surface separately — you get a quantity for each and a combined order.

Outputs
Two layers · yd³ · tons · cost
Material basis
Crushed stone · 105 lb/ft³ default, editable
Method
Formulas & sources

Inputs

Units
01 Plan area

Add each part of the area. Irregular shapes: split into rectangles, circles and triangles.

    02 Layers

    Base layer e.g. #2 stone or road base

    Surface layer e.g. #57 stone

    The 20% compaction starting value is a planning allowance, not a measured figure. Read about compaction

    03 Allowances & price
    Prices from your quote (optional)

    Driveway order

    Why two layers

    Gravel driveways are usually built with a coarse base that spreads the load and a finer surface that drives well. One supplier's published guidance for a light-use residential driveway is 4–6 in total: 2–3 in of large angular stone such as #2, then 2–3 in of smaller stone such as #57. It recommends 8 in or more for heavy use Port Aggregates. That is one supplier's guidance, not a standard; soil, drainage, climate and traffic all matter.

    Each layer here has its own material, depth, density and compaction allowance. The plan area and waste allowance are shared, because both layers cover the same footprint.

    Compaction allowance

    Driveway stone is compacted, so the loose volume you order is more than the finished volume. A gravel-roads manual prepared for the Federal Highway Administration notes a “30% or greater reduction in volume” from ordinary compaction in many areas source; that corresponds to about 43% extra loose material. The 20% starting value in this calculator is a planning allowance, not a measured figure. Ask your supplier what they see for their product and change it.

    Worked example: 60 ft single-car driveway

    BaseSurface
    Plan60 ft × 10 ft = 600 ft²
    Depth (compacted)3 in3 in
    Volume150 ft³150 ft³
    + Compaction 20%180 ft³180 ft³
    + Waste 5%189 ft³ = 7.0 yd³189 ft³ = 7.0 yd³
    Weight at 105 lb/ft³≈ 9.92 tons≈ 9.92 tons
    Order14.0 yd³ ≈ 19.85 US tons in total

    For layer choice, drainage and cost, read the gravel driveway guide.

    Reading the result

    Each line of the order sheet answers a different question. Read them in order: geometry first, then your allowances, then the quantity you can actually buy.

    Per layer
    Calculated volume, + compaction, + waste, purchase volume, weight and bulk order — separately for base and surface.
    Total
    Sum of both layers' purchase volume and weight.
    Cost
    Each layer's price × its quantity, if you enter prices.

    What this calculator assumes

    • Dimensions are the plan area that will actually be covered.
    • Depth is an average across the area.
    • Areas are flat; slopes aren't adjusted for.
    • Both layers cover the same plan area.
    • Depths are compacted depths; the compaction allowance converts them to loose volume.
    • Each layer has its own density and compaction value.

    It can't see your site or your supplier's stone. What the calculators cannot know · Full methodology

    Common mistakes with this calculator

    1. Forgetting compaction on compacted layers

      What goes wrong: Stone packs down. A 30% volume reduction needs about 43% more loose material than the geometric volume.

      How to avoid it: If your depth is the finished, compacted depth, set a compaction allowance. Leave it at 0 for loose decorative cover.

    2. Using one material for both layers by default

      What goes wrong: Base and surface stone usually differ in size and weight.

      How to avoid it: Set each layer's material and density separately.

    3. Treating tons and cubic yards as the same thing

      What goes wrong: Weight depends on the material. The same 2 yd³ is about 2.62 tons of dry sand but 3.38 tons of wet gravel at the reference values.

      How to avoid it: Convert with a density you can see — ideally your supplier's — using the yards-to-tons calculator.

    Questions

    How much gravel do I need for a driveway?

    Measure length × width, decide the compacted depth of each layer, and add a compaction allowance because loose stone packs down. The calculator works out each layer and gives a combined order in cubic yards and tons.

    How deep should a gravel driveway be?

    One supplier's guidance is 4–6 in total for light residential use and 8 in or more for heavy use, built in layers. Local soil and drainage conditions matter, so treat that as a starting point.

    Does this include excavation or fabric?

    No. It estimates stone only. Digging out, geotextile, edging, culverts and delivery aren't included.